Algeciras Port Authority
CEPSA’s “Gibraltar-San Roque” refinery is fitted out with piers and a sea-island anchored at 60 metres depth, where oil-tankers of up to 350,000 tons DW can moor and unload up to 12,000m3/hour.
The port that is located within the facility has seven loading and unloading berths on a 1,467-metre-long pier, plus another terminal dedicated exclusively to barge activities. Ships of up to 175,000 tons DW can berth at the facility, whose drafts vary from between 6 and 20 metres depth.
CEPSA
Project developed in the framework of Complementary Actions for Initiation. Driven by the Chamber of Commerce of Campo de Gibraltar and funded by the European Regional Development Fund.
Cámara Oficial de Comercio, Industria, Servicios y Navegación del Campo de Gibraltar • Paseo de Cornisa s/n. 11204 Algeciras (Cádiz)
t: 956 646 900 • f: 956 646 915 • camara@camaracg.com